HOME        LAKEVIEW FORGE COMPANY / ERIE TOOL WORKS                                                                                                                           Page: 1 of 5       


QUALITY ASSURANCE STANDARD CLAUSES

Rev.: E Dated 27 January, 2011

 

NOTE: When referenced on the Purchase Order, the following Quality Assurance Clauses are applicable.

If there are any questions that exist between the Standard Clauses and another requirement identified on the Purchase Order, please notify Purchasing for clarification prior to any action or work by the supplier.

            Document revisions current at the date of this Purchase Order apply unless otherwise specified.

 

100.      In-process Source Inspection: (Product Verification) Notify LFC / ETW / Customer Quality Assurance 48 hrs., prior to product availability.

 

Lakeview Forge Company / Erie Tool Works Division reserves the right to verify product conformance on any or all materials included in this Purchase Order at the suppliers plant.

 

101.      LFC / ETW verification is required of the supplier’s product prior to releasing shipment.

            When verification is required at the supplier’s plant, the Purchase Order and or attachments shall contain the following statement:

 

            “Lakeview Forge Company / Erie Tool Works Division’s source inspection is applicable to this order.  Please contact LFC / ETW upon receipt of this order to schedule verification arrangements, to verify the method of release is identical to that required in the Purchase Order.”

 

Performance of source inspection does not relieve the supplier from supplying acceptable product.  Should discrepant conditions be discovered at LFC / ETW during receiving inspection or at final destination, actions for nonconforming product will be authorized.

 

102.      Customer verification is required of the supplier’s product prior to releasing shipment.

            When customer verification is required at the supplier’s plant, the Purchase Order and or attachments shall contain the following statement:

 

            “Lakeview Forge Company / Erie Tool Work’s customer or customer representative verification is applicable to this Purchase Order.  Please Contact LFC / ETW upon receipt of this order to LFC / ETW customer verification arrangements and the method of product release.”

 

Performance of source inspection does not relieve the supplier from supplying acceptable product.  Should discrepant conditions be discovered at LFC / ETW during receiving inspection or at final destination, actions for nonconforming product will be authorized.

 

NOTE:            Shipments received by LFC / ETW not source inspected when required by Purchase Order shall be returned to the supplier at the supplier’s expense.

 

200.      Product Identification:

 

201.      Product supplied to this Purchase Order shall be identified by tag or otherwise as directed by the part drawing or this Purchase Order.

 

202.      Product supplied to this Purchase Order shall comply to Mil-Std-130.

 

203.      Material Certification, (Mill Certification) packing slips and any other documentation required by the Purchase Order must accompany all steel deliveries or the shipment is subject to return at the supplier’s expense.

 

FORM: P-LFC-7.4.1-1-F7                         Rev. E                                                                      LAST PRINTED 27 JANUARY, 2011 5:13 PM       

 


                                                                                                                                                                                                     Page: 2 of 5            

QUALITY ASSURANCE STANDARD CLAUSES

 

300.      Packaging and Shipping:

 

301.      Steel bars must be blocked. Steel not blocked is subject to return at the supplier’s expense.           

 

302.      Suppliers shall assure the appropriate protection is used to guarantee product is not damaged during shipment back to LFC / ETW.

 

400.      Quality System Flow Down:

 

401.      LFC / ETW suppliers are required to flow down to sub-tier suppliers the applicable requirements in this purchase order and or purchase order documents including any key characteristics where applicable.

 

402.      Records are to be retained by and made available to LFC and its customers and or regulatory authorities from the lowest level supplier to the organization level for a minimum of 5 years.    (Right of Access)

            Records may be retained on hard copy or electronic media.  Records will be legible, easily identified, readily retrievable and filed in an orderly manner.  Records are to be maintained in a suitable environment to prevent damage, deterioration or loss.

 

403.     Right of Access by LFC and LFC customers and regulatory authorities to applicable quality records at the suppliers and sub-tier suppliers contracted by the supplier.

 

500.      Certification Requirements:  (The matrix below identifies the required information needed at a minimum for all certifications)

           

REQUIREMENTS

COC

(501)

SPC

(502)

MCTR

(503)

DATE

X

X

X

P.O. & ITEM NUMBER

X

X

X

SPECIFICATIONS & REVISIONS

X

X

X

COMPANY NAME

X

X

X

HEAT OR LOT NUMBER

X

X

X

PART NUMBER & REVISION

X

X

X

PRINTED / TYPED NAME & SIGNATURE OF AUTHORIZED REP.

X

X

X

MATERIAL GRADE & CONDITION

 

X

X

PROCESS DESCRIPTION

 

X

 

QTY PROCESSED, ACCEPTED, REJECTED

X

X

 

CLAUSE PER LFC / ETW

X

 

 

            * The number with in the ( ) refers to the LFC / ETW Quality Clause

            ** Signature stamps are not acceptable

 

501.      Certificate of Conformance: The supplier or sub-supplier shall submit with each shipment, and should contain in the body of the COC the following statement: (Refer to matrix, clause 500)

 

“This COC certifies that all material (s) and processes used in the manufacturing, inspection and     testing conform to all applicable Purchase Order, Drawing and Specification requirements. 

Evidence of all certifications and test reports are on file at our plant subject to examination.”

 

FORM: P-LFC-7.4.1-1-F7                         Rev. E                                                                          LAST PRINTED 27 JANUARY,  2011 5:13 PM

 

                                                      


                                                                                                                                                                                                                Page: 3 of 5

 

 

QUALITY ASSURANCE STANDARD CLAUSES

502.      Special Process Certification:  Suppliers and sub-suppliers performing special processes required by this Purchase Order shall submit with each shipment a certification which will include a complete description of the stated process performed. (including specific types grades or class etc.)

            (Refer to matrix, clause 500)

 

503.      Material Certification Test Report: (Mill Certifications) Raw material suppliers will submit test reports attesting to the acceptability of all characteristics required by the Purchase Order and the material                   

 

504.      Domestic material only: Only domestic material is allowed on this Purchase Order.  A statement of certification or separate certification is required. Steel must be melted in the United States or a qualifying country.  Specialty metals are defined in the Defense Federal Acquisition Regulation (DFAR) supplemental clause 252.225-7014, preference for domestic specialty metals, alternate I applies.  Qualifying countries are listed in 225.872-1 (a).  http://www.acq.osd.mil/dpap/dfars/html/r20060512/252225.htm

 

600.     Higher Level Quality Management System:

 

601.      The supplier shall have an established and maintained Quality Management System as defined by ISO 9001:2000 with third party registration by an accredited registrar.

 

602.      The supplier shall have an established and maintained Quality Management System as defined by AS9100 with third party registration by an accredited registrar.

 

603.      The supplier’s Quality Management System shall be compliant to the ISO 9001:2000 Standard.

 

604.      The supplier’s Quality Management System shall be compliant to the AS9100 Standard.

 

605.      The supplier’s Quality System must include at a minimum documented procedures that cover:

Control of Documents, Control of Records, Internal Audits, Control of Non-conforming Product, Corrective Action and Preventive Action and approved by LFC / ETW.

 

606.      Control of Monitoring and Measuring Equipment:

 

607.      The supplier must control the calibration of measuring and monitoring equipment against certified standards traceable to the National Institute of Standards Technology. (NIST)

 

608.      The supplier must control the calibration of measuring and monitoring equipment against certified standards traceable to NIST and in accordance with one of the following:

 

609.      ISO 10012 Calibration Systems

 

610.      ANSI/NCSL Z540

 

611.      Mil-Std-45662

 

612.      First Article Inspection: FAI conforming to the requirements of this purchase order is required for items processed or manufactured or tested to Lakeview Forge Co. and or Erie Tool Works Division.  Supplier drawings and specifications unless otherwise specified in the documentation attached to this purchase order.  First articles are required if product has not been processed for LFC/ETW for two years.

            Standard approaches for Seller (supplier):

·         The Seller (supplier) does the entire FAI, and submits acceptance documentation with the first delivery.  LFC/ETW may request FAI documentation for review before first delivery.  This will be considered the standard approach method unless otherwise specified.

 

FORM: P-LFC-7.4.1-1-F7                         Rev. E                                                                      LAST PRINTED 27 JANUARY, 2011 5:13 PM

 


                                                                                                                                                                                                                  Page: 4 of 5

 

                                      QUALITY ASSURANCE STANDARD CLAUSES

 

·         The Seller (supplier) does the entire FAI.  LFC/ETW source inspection verifies data and /or tests at the sellers site.

·         LFC/ETW receives the FAI shipment and does the FAI according to internal documentation for FAI of LFC/ETW items.

The purchase order referencing this requirement shall identify the alternate FAI approach being imposed on the seller (supplier) if the if the standard approach is not used. A supplier that is unable to comply with the FAI requirements must submit an FAI plan to LFC/ETW buyer approval prior to beginning manufacture/processing.

Reports:

The sellers (suppliers) FAI report shall show the actual measured values, the number of observations for each drawing characteristic, and the specified acceptance inspection requirements.  The first article inspection/test report (FAI/TR) and sustaining data shall be available for review by the buyer’s Quality Representative, upon request during the period of retention.  The Seller (supplier) may use their own forms to record the FAI results as long as the forms contain all the data required.

First Article Failure:

Failure of any one item or characteristic to pass FAI shall constitute rejection of the lot.  The seller (supplier) shall not re-present the lot until documented records can be provided that indicate:

·         Cause and corrective action was taken by the Seller (supplier) to resolve the process, or documentation discrepancy (i.e. rework, replacement, scrap etc.)

·         Cause and corrective action was taken by the seller (supplier) to prevent reoccurrence of the discrepancy in future processing.

·         Re-do FAI for affected characteristics  

 

Performance of first article inspection does not relieve the supplier from supplying acceptable product.  Should discrepant conditions be discovered at LFC / ETW during receiving inspection or at final destination, actions for non-conforming product will be authorized.

 

700.     Nonconformance:

 

701.      Any requirement which will not meet the criteria of LFC/ETW  purchase order requirements must be reported to LFC / ETW in writing.  A preliminary disposition must be received from LFC / ETW purchasing prior to shipping any nonconforming product.  The appropriate documentation shall state the exact nonconformance and authority to ship.  If the nonconformance is accepted on a one-time waiver or deviation basis, LFC / ETW may impose a reduction in the purchase price as consideration to compensate for processing the waiver in-house and/or with LFC / ETW customer.

 

702.      Latent raw material defects detected during subsequent processing of castings, forgings, extrusions and raw bar stock will be the responsibility of the supplier.

 

703.      When purchased product is clearly defined by specifications, drawings, etc. and a nonconformance is found on delivered product, correction and or corrective action is expected by the supplier and must be approved by LFC.

 

704.      When rework and or repair is required in order to meet the defined purchase order, specifications, drawings etc.,  approval must be granted by LFC/ETW in writing and a rework or repair plan  must be submitted and approved by LFC/ETW by the supplier prior to the start of any rework or repair.  

 

705.     When delivery of product can not be made within the requirements of the purchase order, the supplier is required to notify LFC/ETW prior to the agreed upon delivery date to allow ample time to reschedule.   

 

 

 

FORM: P-LFC-7.4.1-1-F7                         Rev. E                                                                      LAST PRINTED 27JANUARY, 2011 5:13 PM

 


                                                                                                                                                                                                                                                                                 Page: 5 of 5

 

 

QUALITY ASSURANCE STANDARD CAUSES

 

800.     Statistical Process control:

 

801.      The supplier and/or sub-suppliers shall have a “Statistical Process Control” program in effect in their facility with applicable procedures in their quality and/or procedure manual.  Statistical data shall be submitted as evidence that the suppliers parts/processes are within allowable specification tolerances.

            A Cp value of 1.33 minimum for process capability is required.

 

900.     Workmanship:

 

901.      All items of this Purchase Order shall be manufactured, inspected and tested in a skilled, high quality manner.  Particular attention shall be given to:

            Product cleanliness, presents of foreign material, legible identification and general appearance.

 

1000     Change Control:

            The supplier is required to notify LFC/ETW of any changes listed below that may require a complete, or partial FAI to be conducted on the first production lot manufactured / processed after such change.  The following definitions will be used by LFC/ETW to evaluate the type and significance of the change.

            Change to Facility/Processing Equipment:

            A facility / processing change, is a change in or to tools, test equipment, measuring equipment, processing tanks, bake ovens or other plant processing equipment etc., used to manufacture, process, inspect and or test of an item.

            Change to Procedures:

            A change to the numerical control program or translation to another media, methods, procedures, planning and or sequencing used in or applicable to the manufacturing, processing , inspection and or test of an item.

            Change in Location:

            A change in location of the site where some or all of the manufacturing / processing is performed.  This may include moving a process line, major change in facility procedures, significant personnel and or processing changes.

            Change in Source or Processing:

            Such changes may be from an outside processing source to within the supplier’s facility.  From within the supplier to an outside processing source, or from one outside processing source to another.

 

 

1100     Process and Personal Qualifications:

            The supplier shall submit evidence that the processes and personnel are qualified / certified IAW imposed specifications.  Unless otherwise specified, such evidence shall be supplied with the initial shipment.  Qualifications / Certifications include, but are not limited to

·         Calibration of bake ovens (i.e. AMS 2750 Pyrometry)

·         Calibration of Gauging Equipment (ANSI/NCSL Z 540-1)

·         (Salt Spray Equipment (ASTM B 117 Salt Spray (Fog) Testing

·         Personnel training /testing for in-house test verifications

·         Process monitoring

The supplier shall also retain a copy of such evidence on file for a minimum of 5 years after completion of this purchase order.

 

 

 

 

 

FORM: P-LFC-7.4.1-1-F7                         Rev. E                                                                      LAST PRINTED 27JANUARY, 2011 5:13 PM